Uploaded image for project: 'Target to fiber allocation and configuration'
  1. Target to fiber allocation and configuration
  2. FIBERALLOC-56

Disable trajectory collision checks in demo codes

    XMLWordPrintable

    Details

      Description

      During the ICS/PFI + MCS telecon it was decided that trajectory collision checks should not be run during fiber assignment calculations, since they are based on cobraCharmer functionality that produces outdated results.

      Also the current Cobra movement strategy should avoid trajectory collisions anyway if everything goes to plan, and if collisions actually do occur in the real instrument, this could not be predicted by the current software.

        Attachments

          Activity

            People

            • Assignee:
              Martin.Reinecke Martin Reinecke
              Reporter:
              Martin.Reinecke Martin Reinecke
            • Votes:
              0 Vote for this issue
              Watchers:
              1 Start watching this issue

              Dates

              • Created:
                Updated: