Uploaded image for project: 'DRP 2-D Pipeline'
  1. DRP 2-D Pipeline
  2. PIPE2D-1822

reprocess all data in Hilo as of Feb. 2026

    XMLWordPrintable

    Details

    • Type: Task
    • Status: Open (View Workflow)
    • Priority: Normal
    • Resolution: Unresolved
    • Affects Version/s: None
    • Fix Version/s: None
    • Component/s: None
    • Labels:
    • Story Points:
      2
    • Sprint:
      preRun27Mar2026

      Description

      drpActor runs with the DRP version and calibs available at that time of processing.

      Please reprocess all data using the latest ones.

      The collections will be chained to PFS/latest as well as drpActor/reductions at the bottom of it so that everybody cat look at the single point for the latest reduction.

        Attachments

          Activity

            People

            • Assignee:
              kiyoto.yabe Kiyoto Yabe
              Reporter:
              kiyoto.yabe Kiyoto Yabe
            • Votes:
              0 Vote for this issue
              Watchers:
              1 Start watching this issue

              Dates

              • Created:
                Updated: