Uploaded image for project: 'Instrument control development'
  1. Instrument control development
  2. INSTRM-2836

deactivate automatic detectorMap QA for drpActor

    XMLWordPrintable

    Details

    • Sprint:
      preRun26Jan2026

      Description

      pipetask --log-level .=INFO run --fail-fast --instrument lsst.obs.pfs.PrimeFocusSpectrograph -b /work/datastore -i PFS/defaults -o u/alefur/w.2026.01/test1 -p "$PFS_INSTDATA_DIR/config/pipelines/hilo.yaml" -d "visit IN (136517)" -j 16 >> 136517.log 2>&1
      
      

      As reported on slack, about 350s goes into reduceExposure, 36s in mergeArms, about 200s in dmResiduals, 90s into dmCombinedResiduals

      ~11minutes, that's too slow for on the fly reductions, let's deactivate detectorMap QA for now.

        Attachments

          Activity

            People

            • Assignee:
              arnaud.lefur arnaud.lefur
              Reporter:
              arnaud.lefur arnaud.lefur
            • Votes:
              0 Vote for this issue
              Watchers:
              1 Start watching this issue

              Dates

              • Created:
                Updated:
                Resolved: