Uploaded image for project: 'DRP 2-D Pipeline'
  1. DRP 2-D Pipeline
  2. PIPE2D-1420

Investigate Xenon lines in b-band for run15 calibs

    XMLWordPrintable

    Details

      Description

      In the calib sign-off document we see issues with the Xenon adjustments in the wavelength residuals.

      https://docs.google.com/document/d/1GJLYNk0eOEu8zoqBSNz6OSkhpUAq4RAMWvKsfTkPrw0

        Attachments

          Issue Links

            Activity

              People

              • Assignee:
                wtgee Wilfred Gee
                Reporter:
                wtgee Wilfred Gee
                Reviewers:
                Kiyoto Yabe
              • Votes:
                0 Vote for this issue
                Watchers:
                2 Start watching this issue

                Dates

                • Created:
                  Updated: