Uploaded image for project: 'DRP 2-D Pipeline'
  1. DRP 2-D Pipeline
  2. PIPE2D-1756

Plan for data acquisition in Sep 2025 run (run24)

    XMLWordPrintable

    Details

    • Type: Story
    • Status: Done (View Workflow)
    • Priority: Normal
    • Resolution: Done
    • Affects Version/s: None
    • Fix Version/s: None
    • Component/s: None
    • Labels:
    • Sprint:
      preRun24Sep2025

      Description

      Please make a plan with priority for the data acquisition in Sep 2025 run (run24). 

      • take quartz at cobra HOME and non-HOME position (at dawn?)
        • only br?
        • changing phi/theta
          • At home (i.e. phi is at a limit), moving theta by given steps.
          • Move cobra position enough far from the dot, moving phi by given steps. The position for geometry calibration can be used.
          • (At a given phi, moving theta)
      • take MCS data changing Az/El/InR (keep Cobra at Home)
      • take MCS images to measure boresight ( to see repeatability again)
      • ...

        Attachments

          Activity

            People

            • Assignee:
              Unassigned
              Reporter:
              kiyoto.yabe Kiyoto Yabe
            • Votes:
              0 Vote for this issue
              Watchers:
              1 Start watching this issue

              Dates

              • Created:
                Updated:
                Resolved: