Uploaded image for project: 'DRP 2-D Pipeline'
  1. DRP 2-D Pipeline
  2. PIPE2D-322

Write a function and task to determine wavelength accuracy

    XMLWordPrintable

    Details

    • Type: Task
    • Status: Won't Fix (View Workflow)
    • Priority: Normal
    • Resolution: Won't Fix
    • Affects Version/s: 5.0
    • Fix Version/s: 6.0
    • Component/s: None
    • Labels:
      None

      Description

      Using the results from PIPE2D-380, provide functions that analyze the accuracy of the wavelength solution determined by the 2D DRP pipeline.

      Checks include (but not exhaustive):

      1. For a given exposure, estimate the RMS error in wavelength for each fibers. This can be compared with that determined from the pipeline.
      2. As above, but provide an overall estimate across all fibers.
      3. Examine the error evolution across a number of exposures for any time-dependent trend.

      In addition to the RMS error, other statistics should be considered and if appropriate provided. Plots in addition to textual output should be provided - anything that can assist the team to determine any problems with the wavelength solution.

        Attachments

        1. arc_ne_17244_wl_calib_residual.png
          63 kB
          Kiyoto Yabe
        2. arc_ne_17244_wl_calib_rms.png
          21 kB
          Kiyoto Yabe
        3. arc_ne_17297_wl_calib_rms.png
          28 kB
          Kiyoto Yabe
        4. arc_ne_visit_wl_calib_rms.png
          95 kB
          Kiyoto Yabe
        5. arc_hgar_visit_wl_calib_rms.png
          120 kB
          Kiyoto Yabe
        6. arc_hgar_17197_wl_calib_residual.png
          48 kB
          Kiyoto Yabe
        7. arc_hgar_17209_wl_calib_residual.png
          56 kB
          Kiyoto Yabe
        8. arc_jul2019calibs_hgar_visit_wl_calib_rms.png
          115 kB
          Kiyoto Yabe
        9. arc_jul2019calibs_ne_fiberId_wl_calib_rms.png
          37 kB
          Kiyoto Yabe
        10. arc_jul2019calibs_ne_visit_wl_calib_rms.png
          78 kB
          Kiyoto Yabe
        11. arc_jul2019calibs_hgar_fiberId_wl_calib_rms.png
          38 kB
          Kiyoto Yabe
        12. arc_hgar_fiberId_wl_calib_rms.png
          44 kB
          Kiyoto Yabe
        13. arc_ne_fiberId_wl_calib_rms.png
          41 kB
          Kiyoto Yabe

          Issue Links

            Activity

              People

              • Assignee:
                kiyoto.yabe Kiyoto Yabe
                Reporter:
                hassan hassan
              • Votes:
                0 Vote for this issue
                Watchers:
                4 Start watching this issue

                Dates

                • Created:
                  Updated:
                  Resolved: